Permitting lobby and phone hours are 8 00 a m.
Permit for i stslling copper roof.
Fill out a building permit application with the following information.
Type and number of plumbing fixtures.
Welded or crimp no plot plan required.
When installing copper flashing on your roof use 6 to 7 inch wide strips of copper sheeting which are available at roofing supply stores.
Installing copper strips on a shingle roof revised 2019.
Get a pre inspection checklist if available.
This can not only save money but potentially save your life if the installation was done incorrectly.
Copper vs pex if pex piping is being used a letrer from the contractor is required asking for alternate materials.
Shingle roofing with slope of 5 in 12 or steeper on residential buildings with a maximum of 3 dwelling units and 3 stories.
Run the strips under a row of shingles at the roof.
2 a written contract that specifies all of the agreed to details products and costs of the project.
3 a letter addressed to you from the contractor s insurance carrier confirming that the specific project is covered under the roofer s worker s compensation and.
Copper panels come pre measured with a standard 3 x 14 feet size.
Erecting a small fence.
If pex provide brand model system type.
It shows installing the copper strip on an existing roof not a.
A copper strip on each side of the roof will extend the life of asphalt shingles 40 or 50 years.
Air conditioner heat pump installation f622 014 000 alteration fire safety f622 011 000 alteration polybutylene re pipe f622 053 000 alteration re roofing for low slope roofing f622 053 000 copper tubing gas line f622 046 000.
They also come in 10 x 10 foot roofing squares the metal costs an average 9 per square foot and labor around 5 per square foot.
All hurricane damage related permit fees are being assessed the minimum fee regardless of their scope.
For example you may need to obtain a plumbing permit if you plan to install an underground lawn sprinkler.
Installing floor coverings or.
Copper shingles run up to 14 per square foot for material labor runs to 12 per square foot for the more complex install process.
Watch this short video first.
After installation an inspector will come to ensure the heater was installed correctly.
Also remember to post your permit near your front door or worksite.
Beyond a water heater permit some areas may also require either an electric or plumbing permit depending on the type of water.
Type if fittings ex.
A building permit is not required for the following repair or replacement work in non mixed use residential buildings excluding hotels.